In brief
- In Revit 2024 and later, the Datasmith Exporter plugin is now integrated into Revit by Autodesk, requiring no separate installation.
- When Direct Link Auto Sync is enabled, every change made in Revit is transferred to Twinmotion in real time.
- Object Substitution, available in Revit 2025.2 and later, automatically replaces Revit families with Twinmotion library objects.
- Multiple Direct Links can be added to a single Twinmotion project, one for each design application.
According to Epic Games' official Twinmotion documentation, the Datasmith Direct Link connection between Revit and Twinmotion has become a standard workflow for architecture and interior design firms wanting to bring BIM models into a real-time rendering environment. This guide explains the entire process—from setup to synchronization, object substitution and troubleshooting—step by step, based on official documentation.
How is the Datasmith Exporter installed?
As of Twinmotion 2023.1 and Revit 2024, the Datasmith Exporter plugin is now managed by Autodesk and comes built into Revit; no separate download or installation is required. For older Revit versions, the plugin can be downloaded from the following sources:
The Twinmotion website
The Supported Design Applications (Datasmith) documentation page
The
Pluginstab in the TwinmotionHomepanel
For older versions, Revit must be closed and the previous Datasmith version removed, then the UnrealDatasmithRevitExporter_xx.msi file must be run to complete the Setup Wizard. Once installation is finished, the Datasmith tab appears on the Revit ribbon.
How is Direct Link set up and synchronized?
The steps are as follows:
In Revit, open the scene you want to set up Direct Link for.
In Twinmotion, open the
Importdock from the bottom toolbar.In the
Importwindow, select theDirect Linktab.Under
Options, set your Direct Link import preferences and clickImport.In Revit's
Datasmith Exportertoolbar, clickSynchronize with Direct Linkto start synchronization.
Synchronization time varies depending on the amount and complexity of the data being transferred. If the design application supports Direct Link Auto Sync, every change made in Revit is automatically reflected in Twinmotion; if not, synchronization is done manually with a single click.
One Direct Link can be set up per design application in a Twinmotion project; if multiple connections from the same application are needed, a separate instance of that application must be opened.
Replacing Revit families with Twinmotion objects via Object Substitution
Available in Revit 2025.2 and later, the Object Substitution workflow automatically replaces the geometry of imported Revit families with objects from the Twinmotion Library (including Sketchfab and Megascans objects) or from the user library. Setup takes place in two stages:
On the Revit side: From the View › Twinmotion › Substitution Settings menu, check the Enable Twinmotion Substitution for compatible Revit family categories option. Then, in each family's Type Properties window, select the appropriate object from the Twinmotion Substitution field under Visualization.
On the Twinmotion side: When importing the file via Datasmith File Import or Datasmith Direct Link, the Enable Substitution checkbox must be checked in the Import window. If cloud-based library objects are going to be used, they must be downloaded before starting the workflow.
What does this mean for architecture and arch-viz teams?
This integration shortens the design-to-visualization cycle, especially for BIM-based architecture firms and interior designers. Teams with a Revit subscription can access Twinmotion at no extra cost, providing a cost advantage for small and mid-sized firms. However, since features like Object Substitution require specific Revit versions (2025.2+), firms working with older versions need to plan upgrades. Additionally, the location of the DirectLinkTextures folder and the risks associated with temporary folders are details that need attention to avoid texture loss on large projects.
Common mistakes
If the source file is not open in the design application, it leads to a broken link icon.
Turning off the
Use textures folderoption causes textures to be stored in a temporary folder, risking deletion by the operating system.If the file is not re-imported or re-synced after new family substitutions are defined in Revit following Object Substitution, the new objects won't appear in the scene.
Sources
3 sourcesSource texts are not republished; short quotes are marked, everything else is our own summary and commentary.
Datasmith Direct Link gives Revit-using architecture and interior design offices in Turkey the ability to produce real-time visualizations without the added cost of separate rendering software. Especially in competition and client presentation processes where design revisions happen frequently, the Auto Sync feature eliminates the manual export-import cycle, saving time.
Still, for this workflow to run smoothly, it depends on having the correct Revit and Twinmotion version compatibility; advanced features like Object Substitution are only available in current Revit versions. Offices should keep in mind that synchronization times for large BIM models can lengthen depending on hardware, and it's recommended to test the Direct Link setup and folder settings before a project begins.
Frequently asked questions
Does the Datasmith plugin need to be installed separately for Twinmotion?
As of Twinmotion 2023.1 and Revit 2024, the Datasmith Exporter plugin is provided by Autodesk built into Revit, requiring no separate download or installation. For older versions, the plugin can be downloaded from the Twinmotion website or the Plugins tab.
How is Direct Link Auto Sync enabled?
It's enabled by clicking the Direct Link Auto Sync button in the Datasmith Exporter toolbar of the design application; in Archicad and SketchUp Pro the button's background turns bright blue, while in Rhino its status is checked via the command history window.
Which Revit version supports Object Substitution?
The Object Substitution workflow is available in Revit 2025.2 and later, allowing Revit families to be automatically replaced with objects from the Twinmotion Library or the user library.